PROJECTS

Client: White Desert Ltd

Project: White Desert Antarctica Logistical Operations and Wolfs Fang Runway, Antarctica July 2018- Ongoing White Desert

Title: Project Environmental and Net Zero Lead

Project Environmental Lead and environmental consultant for  White Desert Operations, including Wolfs Fang Blue Ice Runway and supporting logistical operations. Responsible for the preparation and on site implementation of the environmental management system for the operation  of  Wolfs Fang Runway in Antarctica, as well for White Desert's logistical operations. The logistical operations include internal flights within Antarctica and the operation and maintenance of four skiways. Responsible for the preparation the Environmental Management Plans including Environmental Management Plans, Fuel Storage and Handling Management Plans, Waste Management Plans, in accordance with the requirements set out in the Antarctic Treaty, White Desert's Initial Environmental Evaluation and Foreign and Commonwealth Office (FCO) Permit requirements


Client: Lagan Aviation and Infrastructure

Project:  RAF Fairford North East Taxiway Ramp Replacement Defence Infrastructure Organisation, Ministry of Defence

Title: Project Environmental Lead

Project Environmental Lead for contractor for the detail design and construction stage of a military airfield taxiway  refurbishment at RAF Fairford. Responsible for establishment of CEMP on site, provision of advice during project set up and through-out construction, liaison with the Environment Agency in relation to contamination, obtaining environmental permits and approvals. Responsible the preparation and implementation of Materials Management Plan, CEMP, SWMP, CEEQUAL (Excellent score achieved). Responsible for environmental coordination and management of environmental surveys, design team and construction environmental management process. Responsible for managing specialist input.

The project achieved Excellent in CEEQUAL with a high score of 78.4%


Client: Galliford Try Lagan Construction Joint Venture (GTLC JV)

Project: Project Anvil, RAF Marham Airfield, Norfolk, July 2017- June 2019, Defence Infrastructure Organisation, Ministry of Defence

Title: Project Environmental Lead

Project Environmental Lead for contractor for the detail design and construction stage of a military airfield refurbishment and associated structures in RAF Marham. The project includes refurbishment of two runways, taxiways, aircraft service platforms, construction of new hangar building and AGL. Responsible for establishment of CEMP on site, provision of advice during project set up and through-out construction, carrying out environmental site audits, ensuring compliance with environmental requirements of contract and legislation and environmental permits. Responsible for ensuring successful delivery and implementation of CEMP, SWMP, CEEQUAL (Excellent score achieved), DREAM (Excellent score achieved) .Responsible for environmental coordination and management of environmental surveys, design team and construction environmental management process. Responsible for managing specialist input. The project achieved Excellent in CEEQUAL as well as MOD Sustainable Project of the Year 2019.


Client: Galliford Try

Project: 12 Squadron Infrastructure, RAF Coningsby, Lincolnshire, September 2019-March 2020,Minsitry of Defence

Title: Project Environmental Lead

Project Environmental Lead for contractor for the detail design and construction stage of 12 Squadron Building and associated structures in RAF Coningsby. Responsible for establishment of CEMP and SWMP on site, provision of advice through-out construction, carrying out environmental site audits and reviews, ensuring compliance with environmental requirements of contract and legislation. Responsible for ensuring successful delivery and implementation of CEMP, SWMP, and DREAM The project achieved 92% for the Construction phase DREAM assessment and an overall Excellent.